Main Volume 1A Part 2

Main Volume 1A Part 2 (pdf)

Contents Pages
5.4 Tunnels (continued from part 1) 5-14
5.5 Road treatments at intersections and interchanges 5-20
5.5.1 Homebush Bay Drive interchange 5-20
5.5.2 Powells Creek M4 on-ramp 5-22
5.5.3 Concord Road interchange 5-22
5.5.4 Wattle Street (City West Link) interchange 5-25
5.5.5 Parramatta Road interchange 5-29
5.6 Ventilation system 5-31
5.6.1 Overview 5-31
5.6.2 Ventilation facilities 5-31
5.6.3 Operating modes 5-35
5.7 Other ancillary facilities 5-36
5.7.1 Motorway operations complex 5-36
5.7.2 Incident response centre 5-38
5.7.3 Emergency and incident management facilities 5-38
5.8 Other project elements 5-40
5.8.1 Bridges 5-40
5.8.2 Cuttings and embankments 5-43
5.8.3 Drainage and operational water quality 5-43
5.8.4 Lighting, roadside furniture and signage 5-45
5.8.5 Tolling gantries, communication and control systems 5-46
5.8.6 Noise barriers and low noise pavement 5-46
5.8.7 Provision for smart motorway infrastructure 5-51
5.9 Surface road network changes 5-51
5.9.1 Changes to the existing road network 5-51
5.9.2 Pedestrian and cyclist facilities 5-52
5.9.3 Public transport (continues in part 3) 5-53

Leave a comment