Dr Victor Storm – response to Westconnex M4 East EIS

Introduction

I write this from several perspectives. I am a resident of Haberfield and work locally. I am a registered medical practitioner with specialist qualifications in both child & adolescent and general psychiatry (FRANZCP) and public health medicine (FAFPHM). Additionally I am a graduate of Harvard University in public administration (MPA) and of the Australian Institute of Company Directors (GAICD).

This document summarises my objections to the recently published EIS for the M4East proposal. It concentrates on aspects of the health and social impact, including social & emotional wellbeing of residents as a consequence of the M4 East proposal. This along with linked projects, the M5 East duplication & the M4-5 link projects are the bulk of the 33 km long road & tunnel project, collectively known as WestConnex.

Continue reading

Major flaws in Westconnex EIS Traffic report

(Ed: These comments about Westconnex Traffic Modelling are relevant to the Westconnex M4 EIS traffic chapter that is already published on the People’s EIS.Traffic modelling can be daunting but we hope that this contribution, along with other contributions on traffic, can help you prepare your own submission.)

By Anthony McCosker*

Traffic Modelling Flaws

Chapter 8 Traffic and transport and the associated appendix (Appendix G) are based on traffic modelling based on a three-stage system Continue reading